Location:
Tullynahaw, Co. Roscommon, Republic of Ireland.
Description:
Tullynahaw is approximately 3km to the south of Garvagh Glebe Wind Farm. Due to the geographical proximity and co-incident timing of this project and that of Garvagh Glebe in Co. Leitrim (both projects are Gate 2 Grid connection offers), they are both being developed simultaneously.
The combined output of both wind farms will be exported via a dedicated 110kV substation, located on the Garvagh Glebe site.
Expected Commercial Operation Date:
Sept 2010 Produces enough green energy to meet the electricity needs of more than 33,000 homes.
Capacity:
22MW. Produces enough green energy to meet the electricity needs of more than 12,300 homes.
Technology:
11 x Vestas V80/2MW machines.
Emission Reductions per year:
- 45,900 tonnes of CO2
- 262 tonnes of SOX
- 197 tonnes of NOX
|