Carrane Hill Wind Farm

Picture of four wind turbines on a sunny day.

Location:

Carrane Hill, Co. Sligo, Republic of Ireland.

Description:

Carrane Hill is a small windfarm consisting of 4 turbines located in on the Sligo/Leitrim Border and was commissioned in 2006.

Commercial Operation Date:

2006

Capacity:

3.4 MW enough to power to meet the annual needs of over 1900 households.

Technology:

Gamesa G52 (850kw)

Emission Reductions per year:

  • 7,000 tonnes of CO2
  • 41 tonnes of SOX
  • 30 tonnes of NOX